NO |
PROJECT TITLE |
CLIENT |
WORK EXECUTION |
|
START |
FINISH |
11 |
PCSB HX Maint & Insp Angsi PCHE |
Petronas Cari Gali Sbd Bhd |
|
|
12 |
TML PM3S BRD 07HX-1010 Channel Head Repair |
Talisman Malaysia Limited |
26/07/10 |
18/08/10 |
13 |
TML HPWJ 4" Pipeline at Bredero |
Talisman Malaysia Limited |
- |
- |
14 |
TML PM3S BRA 00HX1110B Insp & maint |
Talisman Malaysia Limited |
17/09/2010 |
|
15 |
TML PM3S AUG 2010 PV&HX Inspection |
Talisman Malaysia Limited |
4/8/2010 |
|
16 |
PCSB TCOT HX Insp & Maint Services Batch 2 |
Petronas Cari Gali Sbd Bhd |
13/10/2010 |
|
17 |
PCSB Angsi PCHE Cleaning E2460 & E2560 |
Petronas Cari Gali Sbd Bhd |
15/10/2010 |
|
18 |
TML PM3S BRE OCT 2010 Shutdown |
Talisman Malaysia Limited |
10/10/2010 |
|
19 |
TML PM3N HX Maint & Inspection Sept/Oct 2010 EQS |
Talisman Malaysia Limited |
2/12/2010 |
|
20 |
PCSB TCOT HX Insp & Maint Services Batch 3A |
Talisman Malaysia Limited |
|
2010 |